This is the seventh post in the series on how to install the Connector for Microsoft Dynamics GP; the first six posts covered the prerequisites, installation, adapter configuration, creating a new integration, preparing data for integration and synchronise picklists.
Now that the Connector for Microsoft Dynamics has been installed and configured, the data has been prepared for integration and picklists synchronised, the next step is to start running the integrations.
As an example, I’m going to step through the process of integrating the Unit of Measure Schedules from GP into the CRM Unit Groups.
In the Connector for Microsoft Dynamics (
) navigate down to the UofM Schedule to Unit Group node ( );Continue reading “How To Install Connector for Microsoft Dynamics GP – Integrate Data”