I did a bit of searching and couldn’t find a specific declaration of the upgrade path from Microsoft Dynamics GP 9 SP3 to Microsoft Dynamics GP 2010 R2.
After reading around and trying to work out the correct path, I decided the likely upgrade path would be GP 9 SP3 > GP 10 SP5 > GP 2010 R2, but I would try GP 9 SP3 > GP 2010 R2 and see if it would work (although I was extremely skeptical) as this would save some time on the upgrades if it was possible. Continue reading “Microsoft Dynamics GP 9 SP3 Upgrade Path To 2010 R2”